Welcome to Västerås Sösta Munga Solar Park
In Västerås municipality, Västmanland county, Alstra Energy plans to establish a solar park with an installed capacity of up to 87 MWp.
The park is expected to produce approximately 74 GWh annually, which will be distributed to the public grid. This corresponds to the annual electricity consumption of approximately 15,000 homeowners.
With abundant sunshine and a reliable connection to the power grid, this location is perfectly tailored for solar energy. The workable soil ensures a low-impact installation that safeguards protected natural surroundings. When the project eventually reaches the end of its lifespan, the entire park can be dismantled and recycled with ease, leaving the land untouched and ready for other activities.
Approx. 82 ha
Total area of the solar park
Approx. 87 MW
Installed capacity of the park
Approx. 74 GWh
Estimated annual production
Preliminary timetable
Below you will find the preliminary schedule and an overview of the process. Commissioning is planned for 2028–2029.

Press
Jonas Weissglas
jonas.weissglas@alstraenergy.se

Project Manager
Louise Albinsson
louise.albinsson@alstraenergy.se

Frequently asked questions
Solar parks are essential to power systems worldwide, and we are driving that same rapid expansion here at home. Read our latest updates to follow our current projects and discover how we are shaping the energy landscape of the future.
Is your company interested in building a solar park?
Ensure your company’s energy consumption is fully powered by the sun. Taking ownership of a solar park means actively driving the global renewable transition.
Would you like to know more about the practical steps? Contact us to organize a visit to the solar park. On-site, our experts will explain the mechanics and detail the long-term benefits of a solar energy investment.
Would you like us to contact you?
Do you want a quote or have specific questions about solar energy and/or energy storage? Fill in the form and we will contact you shortly.




