Welcome to Götene Solar Park
One of Alstra Energy’s largest solar parks is taking shape outside Götene. With an installed capacity of 47 MW, the facility is being built on behalf of Commerz Real.
The location was not chosen at random – the solar park is located directly adjacent to an existing biogas plant, creating a natural concentration of renewable energy production in the area.
Alstra Energy is the EPC contractor and is responsible for the entire implementation of the project, from technical design to the finished facility. Construction began in May 2025 and the park is expected to be operational in early 2027.