Welcome to Gustavsberg and Sveneby Solar Parks
Alstra Energy plans to apply for a voluntary environmental permit for two ground-mounted solar power plants. The facilities covered by the consultation are Sveneby and Gustavsberg, with Gustavsberg comprising two sub-areas.
Together, the solar parks are planned to have a total installed capacity of approximately 138 MWp (DC). The estimated annual production amounts to approximately 142.5 GWh of renewable energy, which represents a significant addition of green energy and contributes to long-term sustainable community development.

Gustavsberg – subarea 1
Subarea 1 is planned to have an installed capacity of approximately 75 MWp, resulting in an annual electricity production of 76 GWh.
- Located approximately 2.7 kilometers west of the town of Moholm
- 143.5 hectares
- The properties Sunnerkällan 1:3, Smeby 7:14, and Aspetorp 3:1
- Located in Töreboda Municipality
Gustavsberg – subarea 2
Subarea 2 is planned to have an installed capacity of approximately 19 MWp, resulting in an annual electricity production of approximately 20 GWh.
- Located approximately 4.5 kilometers west of the town of Moholm
- 21 hectares
- The properties Sunnerkällan 1:3 and Kätttilsöna 1:3
Submit your comments on the consultation for the Gustavsberg solar park to: gustavsberg.solpark@ecogain.se
Click below to view the consultation document for Gustavsberg
Sveneby
Sveneby is planned to have an installed capacity of approximately 44 MWp, which
will result in an annual electricity production of 47 GWh.
- Located approximately 4.3 kilometers west of the town of Tidan
- Located in both the municipalities of Töreboda and Mariestad
- Characterized by a flat landscape of forest and farmland
- 62 hectares
- The Sveneby 1:4 property
- 47 GWh of renewable energy per year
Submit your comments on the Sveneby solar park consultation to: sveneby.solpark@ecogain.se
Click below to view the consultation document for Sveneby

Approx. 70 000
Solar panels to be installed
Approx. 225 ha
Total area of the solar park
138 MW
Installed capacity of the park
142 500 000 kWh
Estimated annual production

Press
Jonas Weissglas
jonas.weissglas@alstraenergy.se

Project Manager
Louise Albinsson
louise.albinsson@alstraenergy.se

Frequently asked questions
While solar parks have long driven the global energy transition, it is now Sweden’s time to scale up. In our newsroom, you can go behind the scenes of our ongoing projects and read about how we are transforming underutilized land into the green energy sources of tomorrow.
Is your business ready to invest in its own solar farm?
Guarantee your supply of 100% renewable energy and shield your operations from volatile electricity prices. Investing in your own solar farm goes beyond corporate social responsibility; it is a strategic move that positions you as an active generator in the modern energy market.
Want to see the reality behind the strategy? Reach out to arrange a guided visit to a commissioned solar park. During the tour, we will discuss the technical setup, the financial model, and the tangible advantages of running your business on solar power.
Would you like us to contact you?
Do you want a quote or have specific questions about solar energy and/or energy storage? Fill in the form and we will contact you shortly.